Commissioning Survey

Please note this product is not for redistribution - Property of ARMA/Trevor Phipps

Exclusive to ARMA members by accessing the members area using your login details.

Lost your login details? Email Bert at [email protected]

There are a few steps to use with the commissioning Survey, please follow all the steps and remember we are at TRIAL PHASE.

Don't be intimidated or overwhelmed by the documentation, the process of gathering data should only take a few minutes.

Make sure your contact details are left for the customer. It is you we want them to contact for any potential work.

FINALLY, we hope this will help generate work for you, consider using the "Don't Risk It" Flyer

and approaching larger premises such as schools, nursing homes, over 50's villages etc - Good Luck 🙂

Step 1 Read The Guide 

Data Acquisition Guide

 

Step 2 Download The Consumer Flyer

Consumer Flyer - Low Cost Energy Efficiency Inspection

Step 3 Download the Customer Checklist - This is what you will leave with the customer.

We recommend having a book for quotes handy.

Customer Checklist

Step 4 Enter The Data

If no label write N/A
If no label write N/A
If no label write N/A
If no label write N/A
If no label write N/A
If no label write N/A
If no label write N/A
Only write known pressure if compound gages were installed if not write (N/A)
Only write known pressure if compound gages were installed if not write (N/A)
Only write known pressure if compound gages were installed if not write (N/A)
Fixed speed if not write N/A
Fixed speed if not write N/A
If not inverter write N/A
Only write known current draw if amp meter or Tong amp meter was installed if not write (N/A)
Air flow measuring equipment required, If not then write (N/A)
Air flow measuring equipment required, If not then write (NA)